Connect with us
Maduka University Advert

News

Naira redesign: Miyetti Allah requests extension of time from CBN

Published

on

Maduka University
Awka—THE leadership of the Miyetti Allah Cattle Breeders Association of Nigeria, MCBAN, has appealed to the Central Bank of Nigeria , CBN, to  extend the deadline for the circulation of the redesigned currencies by three months to enable its members have more time to deposit their current currencies in the banks.
The leader of the association in the South-East, Gidado Siddiki said yesterday in Awka that the extension would enable its members who are mostly living in the forests and bushes due to the nature of their grazing business, to bring out their  savings for proper transformation to redesigned  naira notes to avoid huge losses.

According to the CBN, the redesigned currencies will start circulating on December 15, 2022.

While expressing full support for the new policy, Siddiki recalled that when a similar policy was announced in 1985, many of his members who were in their grazing settlements in the rural areas across the country, lost their money because of the impromptu nature of the execution of the policy.

He said: “The cattle breeders could not meet up with the time frame  given then by the apex bank as the two weeks given was not enough for them to meet up.

“As a result, the majority of the herders lost their life savings because many of  them do not have bank accounts and therefore do not keep their money in the banks. Their normal practice is to keep and protect their money wherever they are.

Advertisement

“We cannot fight or reverse the government policy as law-abiding citizens of Nigeria, but we are only appealing to the CBN to help us extend the deadline for another three months to enable the leadership of Miyetti Allah to  reach out properly to those living in out-of -ommunication areas across states of the federation.”

Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

News

Enugu CP Giwa Bids Farewell, Decorates 31 Promoted Officers Ahead of Handover

Published

on

Maduka University

The outgoing Commissioner of Police in Enugu State, CP Mamman Bitrus Giwa, has held a valedictory conference with officers and men of the State Command ahead of his formal handover to his successor, CP Fidelis Ndubuisi Ogarabe.

The conference, held on Monday, November 16, 2026, provided an opportunity for CP Giwa to appreciate personnel for their support and cooperation during his over 20-month tenure.

Giwa urged officers to sustain the standards of professionalism, discipline, accountability and people-oriented policing established during his administration, while extending the same cooperation to the incoming commissioner.

Reflecting on his time in Enugu, the outgoing police chief expressed satisfaction with his contributions towards stabilising the state’s security situation and strengthening discipline and professionalism within the Command.

He also charged officers to strictly adhere to the resolutions and directives from the recent conference between the Inspector-General of Police, IGP Olatunji Rilwan Disu, and strategic senior police officers, particularly on tackling criminal activities and electoral violence.

The event featured emotional tributes to the outgoing commissioner and the decoration of newly promoted senior officers.

Advertisement

Among those decorated were Ukaga Jenkins Tobechukwu, in charge of Police Medical Services, and George Okwudili Okwor, in charge of the Force Animal Branch, who were promoted from Assistant Commissioners of Police to Deputy Commissioners of Police.

Others included Onuoha Joseph Chijioke and Eita Tijani Samson, who were promoted from Superintendent of Police to Chief Superintendent of Police.

A total of 31 officers benefited from the promotions, comprising two Deputy Commissioners of Police, three Chief Superintendents of Police, six Superintendents of Police and 20 Deputy Superintendents of Police.

The valedictory conference marked Giwa’s final official engagement with personnel of the Enugu State Police Command after more than 20 months in office.

He is expected to formally hand over to CP Fidelis Ndubuisi Ogarabe before proceeding to the Force Criminal Investigation Department (FCID), Abuja, where he has been redeployed to head the Special Enquiry Bureau.

Advertisement

The development was contained in a statement issued on Monday by the Enugu State Police Public Relations Officer, SP Daniel Ndukwe.

Continue Reading

News

Anambra Central Senatorial Seat and the Challenge of Dozie Nwankwo

Published

on

Maduka University

By Maduka Ebunilo

With the campaigns for the 2027 elective positions already in earnest, the candidacy of those vying for Anambra Central Senatorial Zone is once again in the spotlight. What will determine the success or failure of each of the candidates in the election will depend on a number of factors chief among which is the tract record of the individual candidates and their ability to stay the course.

Factors that facilitated the victory of some of the candidates in previous elections like leveraging party affiliation or hitching one’s wagon to a star may not work this time around. This is because those who benefitted from the arrangement ended up working for themselves and not the people who sent them. Apart from the fact that the interest of the people often comes a distant second many of the beneficiaries are spent forces looking up to the senate as a rehabilitation home.

Past elections seemed to care less about these things and chose age over vibrancy, and rhetoric above action. People were bamboozled into believing that age alone confers political wisdom forgetting that the age of Methuselah has little to do with the wisdom of Solomon. Or that the Central Senatorial Zone has been up close to appreciate the saying that a widely-traveled man has an unqualified advantage over the aged. The January 2027 senatorial elections will be decided differently with the mantra of voting competence and experience sufficiently interrogated. What benefits in voting competence and age to the Zone, if any, will have to be justified in order to merit consideration.

The aspirations of all the candidates will be roundly reviewed and set on the pan of a balance in the interest of the Zone and for the good of its people. The entitlement mentality of some of the candidates will lose its electoral value and victory hitherto secured on fleeting glory will be viewed on grounds of concrete achievements. The myth of the older politicians as the real McCoy will be shattered with a little examination of their records in representation either in the lower or higher Assembly.

Advertisement

The aspiration of Dozie Nwankwo is not predicated on mouthing cliches and demagoguery, but it far outpaces the others in fulfilling electoral promises and giving back to the society. The self-effacing and compassionate Nwankwo has proved to be light years ahead of the inconsistent and inconsiderate politicians he is working hard to relieve from duty. Unlike those politicians, he does not make empty promises and hardly neglects responsibilities of an elected office. He is not a fly-by-night politician who lacks permanence or becomes transient in his dealings with the people once in office.  The coming election is a call for viable representation – a time for duty above noise.

It is important to state here that Hon. Dozie Nwankwo is neither new in politics nor in the business of representation. He has a record of performance that speaks when others are muted in conversation. His years as the House Member, representing Dunukofia-Njikoka- Anaocha Federal Constituency still stand as a testament to courageous representation. He proved within the period that age and experience matter but that character trumps all put together. What he achieved in relation to the performance posted by those with age and experience are incomparable.

A peep into the records shows a catalogue of achievements he made within the period he was the member, representing the people of Dunukofia-Njikoka-Anaocha Federal Constituency. It was recorded for him as perhaps the only person who has represented his constituency whether in office or out of office. While in office he brought the constituency’s concerns and the broader national issues to the floor of the House. His motion on the recurring Academic Staff Union of the Universities strikes where he called for dialogue between the Federal Government and the University teachers, urging action to prevent further disruption in university education in Nigeria, stands today as a testimonial to his vibrant representation. It is a fact that that effort with active support from the state, has reduced the rate at which universities down tools in protest over conditions of service. This is in addition to other sponsored bills and motions he moved to compel the state to look at the problems confronting his constituency in particular and Anambra state in general.

But it is the record of his activities since leaving the House that has continued to elicit commendation from the people. In Enugwu Ukwu, one of the communities that compose the Central Senatorial District, he established a Centre for Development and the ICT, conceived to expand access to digital education, vocational training and skill acquisition. It was designed to host 250 computers and a 150 fully installed systems and since commissioning, has actively engaged people in information technology across Anambra Central Senatorial Zone. The centre has been running without let in the effective training of the youths in ICT and various skills.

With the Ferdinand Dozie Nwankwo Foundation, established in 2009, he has been able to successfully empower a lot of people without recourse to either government support or funding from NGO in the entire stretch of the Anambra Central Senatorial Zone. At a reasoned estimate, he has funded educational pursuit of many indigent students, awarding scholarships from primary school through secondary to university. He attracted the Enugwu-Ukwu campus of the Federal College of Agriculture Isiagu. He has empowered youths and women in various skill acquisition with start-up capital for small businesses. He did not do less in healthcare where he has sponsored a number of medical outreaches, offset hospital bills for those who could not afford them and procured eye glasses for those with vision impairment. He has also done a lot of work in community development like water projects, rehabilitation of schools, community halls in all the seven Local Governments of the Zone just as he has committed enormous time and resources in building human capital. Truth is that he compares to none of the contestants currently on the ballot in terms of performance requiring the people’s mandate on January 16, 2027. It was for this reason that he is referred to as Onye-Ndozi( a repairer) because he allows no slip in rebuilding the society that has suffered betrayal in the hands of some selfish political leaders. His aspiration to the senate is not just popular but most desirable for the reasons above.

Advertisement

Ebunilo( Public Affairs Commentator, writes from Abagana

Continue Reading

News

Plateau APC Rally: Massive Turnout Shows Confidence in Tinubu’s Administration – Emeka Okafor

Published

on

Maduka University

*…Tinubu’s Leadership and reforms Draws Massive Support At Jos APC Rally.*

Jos- The Deputy National Organising Secretary of the All Progressives Congress (APC), Chief Emeka Okafor Esq has attributed the large turnout at the All Progressives Congress (APC) Presidential campaign rally in Jos, Plateau State, to what he described as growing confidence in President Bola Tinubu’s leadership and reforms in the country.

The Presidential Campaign Rally had President Bola Ahmed Tinubu, First Lady Oluremi Tinubu, Vice President Kashim Shettima, and Hajiya Nana Shettima, National Assembly Leadership led by the Senate President Godswill Akpabio, Deputy Senate President Barau Jibrin, and Speaker of the House of Representatives Tajudeen Abbas in attendance. Others present are APC National Chairman Prof. Nentawe Yilwatda, The Presidential Campaign Council Director-General Senator Abdulaziz Yari, Chief of Staff to the President, Hon Femi Gbajabiamila, Kwara State Governor AbdulRahman AbdulRazaq, and Ogun State Governor Dapo Abiodun, Members of National Working Committee of the Party.

Addressing the Enthusiastic Supporters at the Rally, President Bola Tinubu revisited the age-long communal attacks in Plateau State with a declaration that his government is taking stern security measures against those carrying out the dastardly acts in the state.

The President outlined fresh measures to address the prolonged insecurity in Plateau State, where recurring attacks have resulted in killings, destruction of homes and displacement of several communities.

Advertisement

President Bola Ahmed Tinubu disclosed that he had directed security agencies to intensify operations against those responsible for violent attacks and ensure restoration of lasting peace across the state.

Speaking to Newsmen at the Rally, Chief Emeka Okafor said he is very happy with the massive turnout of Plateau people and voters. The joyful participation of party members and supporters at the Rally ground , has reflected public appreciation of the President administration’s policies and efforts to address Nigeria’s economic, security and developmental challenges.

“With this massive turnout, the good people of Plateau State have spoken. Today, they have reaffirmed and passed a vote of Confidence on the administration of Mr President and APC. This is a clear demonstration of confidence on Mr President” he said.

Continue Reading

News

My Wife Abandoned Me During Two-Year Hospitalisation, Married Another Man – Husband Tells Court

Published

on

Maduka University

A 14-year-old marriage has collapsed following allegations of neglect, infidelity and abandonment, as a man, Olorunleke Owoyemi, has approached a Grade A Customary Court sitting at Mapo, Ibadan, Oyo State, seeking the dissolution of his marriage.

The petitioner, who hails from Ekiti State, accused his wife, Oluronke, of abandoning him while he was seriously ill and hospitalised for two years, alleging that she subsequently married another man.

Owoyemi told the court that despite his efforts to make his wife comfortable and provide for her needs, she failed to reciprocate his love and commitment.

He further alleged that his wife was involved in an extramarital relationship with their pastor.

According to him, the pastor’s wife contacted him and reported the alleged affair between her husband and Oluronke.

Advertisement

The petitioner said the alleged abandonment occurred when he became seriously ill and spent about two years in hospital.

He claimed that his wife informed his parents that she was tired of the marriage before leaving him.

He further alleged that she subsequently married another man, apparently believing that he would not survive his illness.

Narrating his experience before the court, Owoyemi said he had lost interest in marriage and relationships following what he described as his wife’s betrayal.

He told the court that he met Oluronke in 2006 and married her in 2008, adding that their union produced a male child.

Advertisement

“My marriage to my wife was filled with crisis and woes. I did all I could to make her comfortable and happy. I pampered her and met all her needs.

“She never showed me love nor paid attention to my needs.

“My wife betrayed the trust I had in her when she had an affair with her pastor,” he reportedly told the court.

He also urged the court to grant him custody of their only child, insisting that he did not want another man to raise the boy.

The petitioner maintained that he had remained committed to the child’s welfare by regularly sending money for his upkeep through his mother and paying his school fees.

Advertisement

The respondent, Oluronke, was reportedly absent when the matter came up for hearing, despite having been served with the court proceedings.

The court president, Mrs S. M. Akintayo, subsequently adjourned the case.

The court is yet to make a determination on the allegations or the custody request.

Continue Reading

News

AMUPITAN’S RESIGNATION: INEC dismisses report as false amid voter register controversy, London protest

Published

on

Maduka University

The Independent National Electoral Commission (INEC) has dismissed reports circulating on social media that its Chairman, Prof. Joash Amupitan, is preparing to resign, describing the claims as false, fabricated and misleading.

The commission made its position known on Saturday in a statement published on its official X account, urging Nigerians to disregard the report and refrain from spreading unverified information.

“The claim is FALSE, FABRICATED AND MISLEADING,” INEC declared.

The commission advised members of the public to rely on its official communication channels for accurate information concerning its activities and leadership.

The denial comes amid growing controversy over alleged irregularities in the national voters’ register ahead of the 2027 general elections.

Advertisement

INEC had recently disclosed that it identified 54 persons across 10 states allegedly involved in registration irregularities, warning that those found culpable would face disciplinary action, including possible prosecution.

The commission also announced the removal of more than 1.6 million invalid voter registrations following a nationwide review of its 2025/2026 Continuous Voter Registration exercise.

The development followed complaints from Nigerians over suspected multiple registrations, questionable photographs, unusual registration patterns and the inclusion of records belonging to deceased persons.

The controversy took another dimension in London on Thursday when protesters confronted Amupitan’s convoy outside Chatham House, demanding his resignation over alleged irregularities in the voters’ register.

The protesters surrounded the vehicle conveying the INEC chairman as he departed a discussion on Nigeria’s preparations for the 2027 general elections, calling on him to address their concerns.

Advertisement

At the Chatham House engagement, Amupitan acknowledged that controversies surrounding the 2023 general elections had significantly damaged public confidence in INEC.

He, however, appealed to Nigerians to trust his leadership, insisting that the commission had introduced measures to address previous shortcomings and improve the credibility of future elections.

As part of the preparations, the INEC chairman announced plans for a nationwide mock accreditation and voting exercise on November 28, 2026, to test upgrades to the Bimodal Voter Accreditation System (BVAS) and electronic transmission of election results.

He said the commission had also introduced additional technical safeguards to prevent inaccurate polling unit results and figures indicating over-voting from being uploaded to its Result Viewing Portal.

The commission’s preparations come against the backdrop of heightened public scrutiny of its electoral processes and growing demands for transparency ahead of the 2027 elections.

Advertisement

The presidential and National Assembly elections are scheduled for January 16, 2027, while governorship and State Houses of Assembly elections will hold on February 6, 2027.

Continue Reading
Advertisement

Trending